The paper presents a way of checking and optimization of a demolition scenario at an industrial building based on controlled blasting method in order to transition to the actual demolition of the building in question. For this purpose we used a specialized computer system that describes the behaviour of the structure at exceptional actions, from the application of forces, the opening and propagation of cracks, the separation structural elements up to total collapse of the building.

Simion, Adrian, Dragomir, Claudiu-Sorin (2013). The Simulation of an Industrial Building Demolition. National Institute for Research and Development in Construction, Urban Planning and sustainable Development. Urbanism. Architecture. Constructions ISSN 2069-0509 (print) / 2069-6469 (on-line), Vol. 4, issue no. 2 / 2013


[symple_box color=”gray” fade_in=”false” float=”right” text_align=”left” width=”100%”][/symple_box]